Work is proceeding on the reno of our canteen at our local Am. Legion
post. The first three pics are of the bar frame and paneling.
http://s97.beta.photobucket.com/user/ya ... sort=3&o=6
http://s97.beta.photobucket.com/user/ya ... sort=3&o=7
http://s97.beta.photobucket.com/user/ya ... sort=3&o=5
Second three are after a coat of pecan stain and two
coats of poly, sprayed on.
http://s97.beta.photobucket.com/user/ya ... sort=3&o=4
http://s97.beta.photobucket.com/user/ya ... sort=3&o=2
http://s97.beta.photobucket.com/user/ya ... sort=3&o=3
The last two are of the island that is in the middle of the
bar area, and i have finished it with stain and two coats .of
poly also. Doors and drawers will be in next set. They are
all complete just need to install them.
http://s97.beta.photobucket.com/user/ya ... sort=3&o=0
http://s97.beta.photobucket.com/user/ya ... sort=3&o=1
The granite top arrived Friday, and was put on but not
glued. That should be done Monday. Also the bar top is
been installed, will be staining it Monday and finishing with
3 maybe 4 coats of poly.