Poor Tom! He works all day, has two young kids, a wife/teacher who is off for the summer, storms brewing in the tropics and he decides to take on a built-in project! Is he NUTS! Here is Tom after our marathon cutting session in the 95 degree Florida summer:
We've come a long way from there. The left bank of cabinets is in-place, screwed to the wall and the base. Tom did a fine coping job against the base molding. We've flattened the cabinet front where it was proud in a couple of places. The face frame bits have all been cut, pocket screw drilled, and the first part of the frame is assembled. It's been a lot more detail work than I realized. No wonder Tom looks so tired
Here is the progress so far.
Don't know how much more we'll get done this week. Tom said something about an anniversary... It's like he has a life or something